SEDR Consulting | Rodeo Bridge Demolition
273
portfolio_page-template-default,single,single-portfolio_page,postid-273,ajax_fade,page_not_loaded,,select-child-theme-ver-1.0.0,select-theme-ver-3.2.1,wpb-js-composer js-comp-ver-4.12,vc_responsive

Rodeo Bridge Demolition

At the tail end of its service life, this bridge in Rodeo was demolished and replaced. Working closely with the demolition contractor, we provided plans and specifications to safely demolish and remove the existing bridge.